Part of the humanoid robot

Battery pack

The pack in the torso: cells, a management board and a case.

The step · Battery pack

13-cell series string (G1) with BMS, quick-release housing and connector; UN38.3 transport test; pack-level protection layers. Output: 0.42 to 2.25 kWh pack, 48 to 67 V class.

The map, filtered to who makes this.

Loading the model

The humanoid robot, with the battery pack lit

How it is made6 steps

cellstested battery pack

  1. 1

    Checking and sorting the cells

    Every incoming cell is scanned, measured and sorted, and faulty cells are taken out.

    Detail
    Goes in
    cells
    Comes out
    matched cells
    Equipment
    test and sorting station; at Figure a robot picks, scans and tests each cell
    Why it matters
    One weak cell limits the whole string, so cells are matched before they are joined. · our reading
    Source
    pem.rwth-aachen.de · secondary, read 2026-11-09
  2. 2

    Stacking and bracing

    The cells are stacked in a set order, glued or framed, and pressed together with plates between them.

    Detail
    Goes in
    matched cells, adhesive or frames, insulating plates
    Comes out
    cell stack
    Equipment
    stacking and pressing fixture
    Why it matters
    Cells swell and shrink as they charge, so the stack is held under pressure; the plates stop heat and current passing between cells.
    Source
    pem.rwth-aachen.de · secondary, read 2026-11-09
  3. 3

    Welding the connections

    The cell tabs are joined to connecting strips to make the series string, and each joint's resistance is measured.

    Detail
    Goes in
    cell stack, connecting strips
    Comes out
    connected string
    Equipment
    laser or ultrasonic welder, resistance tester
    Why it matters
    A poor joint heats up under load, so every weld is checked for how well it conducts. · our reading
    Source
    pem.rwth-aachen.de · secondary, read 2026-11-09
  4. 4

    Fitting the management board

    The circuit board that watches each cell's voltage and temperature is mounted and wired to its sensors.

    Detail
    Goes in
    connected string, BMS board, sensors
    Comes out
    monitored string
    Equipment
    assembly station
    Why it matters
    The board is what stops the pack from being overcharged or run too hot. · our reading
    Source
    pem.rwth-aachen.de · secondary, read 2026-11-09
  5. 5

    Closing the housing

    The string goes into its case with the connector, and the case is sealed and checked for leaks.

    Detail
    Goes in
    monitored string, housing, connector
    Comes out
    sealed pack
    Equipment
    screwing station, leak tester
    Why it matters
    A sealed case keeps water out of a pack that lives inside a walking machine. · our reading
    Source
    pem.rwth-aachen.de · secondary, read 2026-11-09
  6. 6

    Loading software and final test

    The board is loaded with its software, and the pack is charged and discharged on a set profile before release.

    Detail
    Goes in
    sealed pack
    Comes out
    tested battery pack
    Equipment
    end-of-line test stand
    Why it matters
    This is the first time the whole pack works as one unit; it leaves at a set state of charge and marked as tested.
    Source
    pem.rwth-aachen.de · secondary, read 2026-11-09
Not published (2)
  • the guide describes vehicle packs; no humanoid maker publishes its pack line beyond Figure's cell test station
  • the UN38.3 transport test named in the recipe step: its steps are not opened here

Who makes it

No makers on the index for this step yet.